Desarrollo de un Plan de Mantenimiento Preventivo para Optimizar los Tiempos de Trabajo en la Empresa KMC Cromo Oleo Hidráulica S.A.C.”

Mostrar el registro sencillo del ítem

dc.contributor.advisor Acosta Medina, Luis Enrique
dc.contributor.author Peñalva Aynaya, Ricardo Javier
dc.date.accessioned 2021-05-04T14:06:06Z
dc.date.available 2021-05-04T14:06:06Z
dc.date.issued 2021-05-04
dc.identifier.uri http://repositorio.upci.edu.pe/handle/upci/311
dc.description.abstract La empresa KMC cromo oleo hidráulica SAC Lima-Perú, es una empresa de capitales peruanos dedicado a brindar servicios de optimización, reconstrucción y mantenimiento de equipos y maquinarias de las grandes empresas en los sectores minería, agricultura y sector pesquero. Pero tenemos una deficiencia el cual se convierte en un problema principal, y es que no se cumple con el cliente en los trabajos requeridos por muchos factores las cuales principalmente son: deficiencias en la calidad del servicio brindado, deficiencias en el tiempo de entrega y muchas veces altos índices de costo por servicio brindado. Este problema está enfocado principales en el área de procesos Mi objetivo es desarrollar un plan de mantenimiento preventivo para optimizar los tiempos de trabajo, Con la finalidad de disminuir y eliminar un mantenimiento correctivo ya que trae muchas consecuencias por máquina parada como es un mantenimiento costoso. Pero específicamente se desarrolla este trabajo porque la empresa necesita estandarizar los tiempos de trabajo por máquina y esto se consigue con una máquina herramienta que garantiza su funcionalidad al 100% sin paradas imprevistas. De esta forma también se consigue cumplir con los trabajos programados y así satisfacer las necesidades de los clientes y cumplir sus expectativas. El proyecto es de método cuantitativo, su tipo de investigación es descriptivo-interpretativo, En el proyecto se desarrollaron distintos tipos de técnicas e instrumentos, específicamente las entrevistas y las encuestas, también el análisis y la observación directa. Para elaborar todo el sistema se desarrolló metodologías, diagramas de Pareto, de Ishikawa, cuadros representativos, un manual de procedimiento. Desarrollando buenos indicadores se pudo concluir con un buen trabajo de investigación que ayuda a la empresa a ser mucho más eficaz, competitivo y sostenible en el tiempo, satisfaciendo las exigencias del mercado y cumpliendo con el eje principal que viene a ser los clientes. Palabras clave: Desarrollo de un plan, Mantenimiento Preventivo, Optimizar los tiempos. es_ES
dc.description.abstract The company KMC cromo oleo Hidraulic SAC Lima-Peru, is a Peruvian capital company dedicated to providing optimization services, reconstruction and maintenance of equipment and machinery for large companies in the mining, agriculture and fishing sectors. But we have a deficiency which becomes a main problem, and that is that the client is not fulfilled in the work required by many factors which are mainly: deficiencies in the quality of the service provided, deficiencies in delivery time and many times high rates of cost per service provided. This problem is mainly focused on the process area My goal is to develop a preventive maintenance plan to optimize work times, in order to reduce and eliminate corrective maintenance as it has many consequences for a stopped machine such as expensive maintenance. But this work is specifically developed because the company needs to standardize the working times per machine and this is achieved with a machine tool that guarantees 100% functionality without unexpected stops. In this way it is also possible to comply with the scheduled works and thus satisfy the needs of the clients and meet their expectations. The project is a quantitative method; its type of research is descriptive-interpretive. In the project, different types of techniques and instruments were developed, specifically interviews and surveys, as well as analysis and direct observation. To develop the entire system, methodologies were developed, Pareto diagrams, Ishikawa, representative tables, a procedure manual. By developing good indicators, it was possible to conclude with a good research work that helps the company to be much more efficient, competitive and sustainable over time, satisfying the demands of the market and complying with the main axis that comes to be customers. Keywords: Development of a Plan, Preventive Maintenance, Optimize time. en_EN
dc.description.uri Tesis es_ES
dc.format application/pdf es_ES
dc.language.iso spa es_ES
dc.publisher Universidad Peruana de Ciencias e Informática es_ES
dc.rights info:eu-repo/semantics/openAccess es_ES
dc.rights.uri https://creativecommons.org/licenses/by-nc-nd/4.0/ es_ES
dc.source Universidad Peruana de Ciencias e Informática es_ES
dc.source Repositorio Institucional - UPCI es_ES
dc.subject “Desarrollo de un Plan de Mantenimiento Preventivo para Optimizar los Tiempos de Trabajo en la Empresa KMC Cromo Oleo Hidráulica S.A.C.” es_ES
dc.title Desarrollo de un Plan de Mantenimiento Preventivo para Optimizar los Tiempos de Trabajo en la Empresa KMC Cromo Oleo Hidráulica S.A.C.” es_ES
dc.title.alternative Optimizar Mantenimiento Preventivo Tiempos es_ES
dc.type info:eu-repo/semantics/bachelorThesis es_ES
thesis.degree.name INGENIERIA INDUSTRIAL es_ES
thesis.degree.grantor Universidad Peruana de Ciencias e Informática. Facultad de Ciencias e Ingeniería es_ES
thesis.degree.level Título Profesional es_ES
thesis.degree.discipline INGENIERO INDUSTRIAL es_ES
thesis.degree.program INGENIERIA INDUSTRIAL es_ES
dc.subject.ocde https://purl.org/pe-repo/ocde/ford#2.11.04 es_ES


Ficheros en el ítem

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

info:eu-repo/semantics/openAccess Excepto si se señala otra cosa, la licencia del ítem se describe como info:eu-repo/semantics/openAccess

Buscar en DSpace


Listar

Mi cuenta

Estadísticas